
Bitumen 85/100 is produced during the process of oxidation of vacuum bottom in bitumen production units. Bitumen 85/100 specifications is as follows:
Property | Specifications | Test Method |
Specific Gravity @ 25/25 c | 1.001-1.05 | D-70 |
Penetration @ 25 c | 85/100 | D-5 |
Softening Point | 45/52 | D-36 |
Ductility @ 25 c | 100 Min. | D-113 |
Loss on Heating (wt) % | 0.5 Max. | D-6 |
Drop in Penetration after Heating % | 20 Max. | D-6 & D-5 |
Flash Point C | 225 Min. | D-92 |
Solubility in Cs2 (wt)% n Cs2 (Wt) | 99.5 Min. | D-4 |
Spot Test | Negative | A.A.S.H.T.O T102 |
American Association of State Highway Officials |
Usage of bitumen 85/100
Due to its medium air blowing and penetration, it is used in cold areas.
Bitumen 85/100 buying FAQ
It depends on terms of payment you choose, for T/T payment MQO is 100MTs that doesn’t consist of inspection report and our suggestion is increase of your order to 200MTs, and if you choose L/C terms MQO is 500MTs.
Packaging type of bitumen 85/100 usually is 180KG new steel drum, however for Bangladesh region is 150KG and for some countries is 200KG, however, it is possible for our packaging factory to prepare base on customers’ order.
110 new steel drums with 180KG stuff into a 20ft container.
within 14-21 days after received operative L/C OR part of agreed T/T payment in advance